News:

14/04/2022 - Summer is almost here!

Main Menu

Burn-in testing

Started by Fluke, September 12, 2009, 12:55:11 PM

Previous topic - Next topic

Fluke

All our LED lights shipped are currently tested twice, the 2nd time includes light meter testing to ensure brightness levels are correct.

From today all lights manufactured will include a burn in period (at least 12hrs) to ensure the LEDs perform over a set period of time.

Photo below shows around 70 Bullet LEDs on soak..